The best national intelligent supercomputing center with high computational density,integration density, energy efficiency, application maturity, performance, and delivery speed.

Product Features

Plentiful
Redundant water and power systems, three independently configurable water pipe systems, intelligent 2N power distribution system, integrated with power and environmental monitoring system, and security surveillance system.
Fast
hort construction period, with a normal construction cycle of 3 months, spacious and comfortable maintenance operation space, easy maintenance, modular design for easy upgrades.
Excellent
Compact structure and rational layout, with an ultra-strong sense of technology in the Cube-like design, aesthetically pleasing appearance, can serve as a landscape architecture, and is pleasing to the eye.
Economical
Save on land use, significantly reduce the building area; lower operating costs, PUE is less than 1.2; reduce the interference of noise, vibration, radiation, etc., to personnel.

Standard Specification

01
The Silicon Cube is divided into two parts: above ground and underground. The above-ground part consists of the main Silicon Cube area and the peripheral supporting area, while the underground part serves as the auxiliary support area for the Silicon Cube.
02
The Silicon Cube's main computer area houses the supercomputer, with the mainframe cabinets arranged in three layers, facing each other in two rows of cabinet frames, supporting up to 66 cabinet positions and 6 aisle cabinets; the dimensions of the Silicon Cube supercomputer are 8.44m × 8.44m× 8.5m, and it is enclosed by a glass curtain wall structure, with the specifications of the glass curtain wall being 14.5m× 14.5m× 9.8m, serving as the external physical security shield for the computer.
03
The peripheral supporting area of the Silicon Cube is equipped with chillers, cooling towers, and other related equipment.
04
The area occupied by the auxiliary support area of the Silicon Cube is determined based on the construction interface and the grade of the computer room, with the general depth of the underground pit being 6 to 8 meters.
05
The mainframe area and auxiliary area of the Silicon Cube serve as the standard construction scope of the Silicon Cube, while the peripheral supporting functional area is optional and can be constructed uniformly or by the user as the site supporting conditions for the Silicon Cube device.